We lucked out with a rain-fee week and were able to get the stucco on the front of the buildings done. I apologize to everyone on Girard Ave for the dusty mess, but I think we are done the messiest exterior part of this rehab.
Facade
Behind Bars
Scaffolding is up in front of the building. After this last piece of stucco work the building will no longer look abandoned 🙂
Front Windows
Front windows are in on the second and third floors. I think it makes the place look a little less abandoned. 🙂
It is pouring outside right now and I’m thinking it’s probably dry inside the buildings during a rainstorm for the first time in years.