Plumbed

Plumbing lines from the 2nd floor to the first floor of 204
Plumbing lines from the 2nd floor to the first floor of 204
We are tapped onto The City of Philadelphia’s water infrastructure and have the beginnings of rough plumbing.

This is system #2 starting to go into the buildings (electrical being #1). Next up is HVAC.

Wired

Electrical boxes in the 2nd floor of 206
Rough electrical is going up in the buildings! Really, things are happening so quickly it’s almost shocking to see the buildings one day to the next.

  • Roofdecks are being framed in
  • The West wall of 204 has been torn down and built back up
  • Stairs to both basements are in
  • Concrete floors and walls and framing is up in both basements

Can’t wait to see what happens tomorrow.